Modern mountain home with timber siding, a stone entry, and large windows amid autumn foliage.

Hoback Junction's October Runs on a Handful of Public Calendars

The commercial river season in the Snake River Canyon ended in September. The schedules that matter around Hoback Junction now belong to public agencies. WYDOT sets the canyon road schedule, dam releases set the river level, the Bridger-Teton National Forest sets the season at Granite Hot Springs, and Wyoming Game and Fish draws its elk hunt boundaries along the Hoback River. Most of their key dates fall between the last week of September and the end of October.

From the junction, the change shows up in a few concrete ways. The raft trailers are gone from the canyon. Flaggers and pilot cars have taken their place on the highway. The river is lower and clearer than it has been since spring, and the drive up Granite Creek has only a few weeks left in its summer season.

The Dates That Set the Season

This is the fall 2026 calendar around the junction, pulled from agency notices and operator schedules.

Date

What happens

Source

Sept. 21

Lewis & Clark lists its whitewater trips as "Closed for the season"

2026 operator schedule

Sept. 28

WYDOT and H-K Contractors begin milling and paving US 89 in the Snake River Canyon

WYDOT release, Sept. 24, 2026

Oct. 2

Snake River releases reach winter flows of 280 cfs

WorldCast Anglers report, Sept. 30, 2026

Oct. 16

Scheduled end of the canyon paving contract

WYDOT 511

Oct. 31

Usual end of Granite Hot Springs' summer season

Bridger-Teton National Forest

Nov. 20

Area 84 Type 6 elk hunting closes east and south of Shoal Creek to the Hoback River

Wyoming Game and Fish

Early December

Granite Hot Springs winter season opens, reachable only over snow

Bridger-Teton National Forest

Dec. 1–31

Separate Area 84 Type 6 elk season south of the Hoback River

Wyoming Game and Fish

The sections below follow that order. Each one picks up where the previous one leaves off.

The Canyon Belongs to Anglers Again

The whitewater season ended on schedule. Lewis & Clark's 2026 calendar dropped to a single 1:30 p.m. departure for Sept. 14 through Sept. 20, then marked Sept. 21 as closed for the season. Dave Hansen Whitewater describes its season as running mid-May through late September. Mad River lists its Canyon trips as May through September, launching from West Table Boat Ramp, and Sands is currently running its trips through Mad River.

The river is changing quickly now that the rafts are off it. WorldCast Anglers' Sept. 30 report said dam releases would keep dropping daily until they reached winter flows of 280 cfs on Oct. 2. It also said turbidity was settling and water temperatures were "in a great place." The same report expects fall fishing on the Snake to be quite good after a summer of higher-than-average flows.

Lower water changes how a day on the river goes, in a few ways the report spells out:

  • Floats take longer. Low flows slow the boat down just as the days get shorter, so the report advises building in extra time.
  • The best hours move to midday. Prime fishing shifts away from early morning toward the warmest part of the day.
  • Summer spots may be gone. Fish move into fall and winter water: slower banks, drop-offs, recirculating eddies, tailouts and seam lines. Some summer runs may be dry or too fast.
  • The bugs overlap. Leftover Hecuba Drakes and Mahoganies mix with BWOs and midges, and hoppers still work on warm, sunny afternoons.

The summer's heat-related restrictions are also over. Wyoming Game and Fish lifted its voluntary afternoon fishing closure on the Snake River and Flat Creek on Aug. 14, after cooler weather brought stream temperatures down. Its standing advice is to pause catch-and-release fishing if water temperatures approach 70°F. In October, the main factor is the clock: midday light and long floats on slow water.

The Highway Is Busy for a Different Reason

The traffic that remains in the canyon is now mostly about the road itself. On Monday, Sept. 28, the Wyoming Department of Transportation and crews from H-K Contractors started milling and paving sections of US 89 between mile markers 120 and 139 near Hoback Junction. Traffic control runs Monday through Friday from 8 a.m. to 4 p.m. Flaggers and pilot cars lead traffic through each work zone at reduced speed, and WYDOT says delays could last 10 to 20 minutes at a time.

The release includes one instruction that matters most to people who live along the canyon. Drivers coming from a side road should stop and wait for the pilot car, let the line of cars headed their way pass, and then pull out and follow it through the work zone. WYDOT expects the work to take about three weeks, depending on weather. Its 511 travel page for US 89 lists the contract as running Sept. 28 to Oct. 16, 2026.

The canyon is only the first stretch of the drive into Jackson. Buckrail reported on Sept. 25 that fall street patching in town would continue through October, including work on South Park Loop Road near South Lane and Blair and at 1020 South Park Loop Road. Buckrail also reported that WYDOT's downtown work starts Thursday, Oct. 1. The Town of Jackson has East Broadway closed for storm inlet work in two phases: Willow to Gros Ventre through Oct. 8, then Gros Ventre to Redmond from Oct. 8 to Oct. 30. Gregory Lane is under reconstruction through November.

On a weekday this month, a trip from the junction into town can hit three separate work zones, each run by a different agency. The canyon zone is the only one scheduled to finish by mid-October.

Granite Has a Few Weeks Left

Granite Hot Springs sits at the end of Granite Creek Road off Highway 189, just above Granite Creek Falls, and is still in its summer season. The Bridger-Teton National Forest says that season usually ends Oct. 31. Hours after Labor Day are 10 a.m. to 6 p.m. Day use costs $12 per person for ages 12 and up and $7 for kids 11 and under, cash only. The site has no cellular or Wi-Fi service and no potable water, and alcohol is not allowed at the pool. The Forest Service describes the drive from Jackson as about an hour, with the last stretch on a bumpy dirt road that can get rough in bad weather.

The Forest Service page still shows a spring notice saying the pool is "closed due to deteriorating access conditions," next to a "Site Open" label. That notice dates from last winter. Buckrail reported on March 18 that the pool closed at the end of the day on Tuesday, March 17, 2026, earlier than usual because of low snowpack on the access road and a warm forecast. Bridger-Teton spokesperson C.J. Adams told Buckrail that the concessionaire's closing procedures include sledding equipment out while the road is still frozen and snow-covered. The Forest Service lists a phone number, 307-690-6323, and calling before the drive is the simplest way to confirm the pool is open.

After Oct. 31, there is a gap before the winter season starts in early December. In winter the pool is open daily from 10 a.m. to 4 p.m., and the only ways in are by snowmobile, dog sled, skis or fat bike. In a typical year, that makes the last weeks of October the end of the season for driving all the way to the pool.

The Hoback River on the Hunt Map

The same drainages are also open for hunting. Wyoming Game and Fish's 2026 forecast for the Jackson Region says mule deer seasons remain conservative, with four-point antler restrictions. It expects elk opportunities to be broadly similar to last year and lists migration timing, elk distribution and access as the main factors in hunter success.

In Area 84, the Hoback River itself is a boundary. Area 84 Type 6 cow/calf hunting runs through Nov. 30. The portion east and south of Shoal Creek to the Hoback River closes after Nov. 20. A separate Type 6 season south of the Hoback River runs Dec. 1 through 31. Around the junction, the river that sets fishing conditions in October also divides the elk seasons in November and December.

Closer to the Junction

Day to day, the junction itself is a quieter place. A retailer's store locator lists Hoback Market at 10880 US-89. It is the junction's grocery and fuel stop, and the News&Guide has profiled it as a market with groceries, a liquor store and a hot deli.

One item from county government affects only the junction. Teton County's action report from the Sept. 1, 2026 meeting records approval of a fee waiver for public water system improvements by the Hoback Junction Water & Sewer District. The primary site is 11055 S. Hoback Junction South Road. It is a small infrastructure project, and like the paving and patching work this fall, it is maintenance on systems the junction depends on every day.

The pathways got their maintenance earlier. Teton County's annual sealcoating ran Aug. 3 through Aug. 7 and covered the South Park Loop Pathway, the US 89/Von Gontard Pathway and the Garaman Pathway, with closures of up to four hours at a time. Those segments are finished, so they are open for fall walks and rides while the highway work continues.

Fall routines around Hoback Junction change along with the seasons, from canyon pilot cars to cash-only soaks at Granite. If you are thinking about how a home here would fit your own calendar from season to season, JH Property Group can go through the details of the Hoback area with you.

Work With Us

Our team is recognized as talented negotiators and trusted advocates for its clients. We provide comprehensive real estate assistance for buyers and sellers in Jackson, WY, and the surrounding areas.

Follow Me on Instagram